How long does it take to build a hydroelectric power station?
The Ministère des Ressources naturelles et de la Faune estimates a run-of-the-river hydro plant can be authorized and built within three years (if it generates less than 5 MW) or four years (if more than 5 MW).
These time frames are much shorter than the ten years or so which are required to build large hydroelectric power stations.